Abstract
Pakistan inherited a very small forest area (4.5%) in 1947. With the result that, over the years, a significant part of the country's requirement of timber and wood products had to be imported. At the same time, the pressure on the indigenous forest resources continued to rise, increasing the demand for timber and pushing up its price steeply. Until early seventies, the forests in Pakistan were harvested by private contractors, who became heavily involved in malpractices, and institution of private contracts came into serious disrepute and was abolished. Since mid-seventies all the provinces of Pakistan are carrying out their timber harvesting and marketing either departmentally (Punjab and Sindh) or through public corporations (NWFP and Azad Kashmir). In the beginning, all these organizations were using tools and methods of forest contractors because there were no arrangements within the country to train the staff in improved methods of tree felling, conversion and transportation and for conducting research to find out the best methods for the local conditions.
The full text of this article is available as a PDF — use Download PDF above.
Services
Article usage statistics
Loading…
Related articles
- Piece-Rates in Tree Felling and conversion in Kaghan valley: Part-IPakistan Journal of Forestry · 2024
- Timber harvesting tools and work stress in irrigated forest plantationsPakistan Journal of Forestry · 2024
- Private farm nurseries in Punjab and NWFPPakistan Journal of Forestry · 2024
- M.Sc Forestry thesis research at Pakistan Forest Institute, 2001-2003Pakistan Journal of Forestry · 2024
- Reduced impact logging and sustainable forestry management in PakistanPakistan Journal of Forestry · 2024
- M.Sc. Forestry thesis research at Pakistan Forest Institute, Peshawar 1989-91Pakistan Journal of Forestry · 2024

