Abstract
Forest roads are important means of timber transportation, forest management, recreation, etc. This paper describes a study to determine the pay-back time period of Shinkiari-Kund forest road. It is concluded that Rs. 3.437 million invested in the 19 km road building will be fully paid back in 4 years. Total timber to be harvested to break-even with the investment is estimated at 6,839 m3 (242,000 cft).
The full text of this article is available as a PDF — use Download PDF above.
Services
Article usage statistics
Loading…
Related articles
- Efficiency and cost of timber transportation by GattuPakistan Journal of Forestry · 2024
- Improved timber transportation strategy for the coniferous forests of PakistanPakistan Journal of Forestry · 2024
- Natural regeneration of Silver Fir (Abies pindrow) in the moist temperate forest of Pakistan (A case study from Kund)Pakistan Journal of Forestry · 2024
- The Relescope and its use in forest inventory workPakistan Journal of Forestry · 2024
- Effect of seed production, distribution, viability, losses and germination on the natural regeneration of silver Fir (Abies pindrow) in moist temperate forests of PakistanPakistan Journal of Forestry · 2024
- Comparison of timber harvesting systems in the Forest Areas of Hazara Civil Division, N. W. F. P.Pakistan Journal of Forestry · 2024

